24/7 emergency line for break-ins and smashed glassCall 0800 088 6341

Cheshire

Projecting signs in Cheshire

Upper-floor businesses in the North West can use a projecting sign to show customers which Cheshire door leads to them.

Hanging projecting sign on an iron bracket

Bracket fixings depend on the wall, so we check the brick, stone or render on your Cheshire premises at the outset. Before fixing anything over the pavement in Cheshire, we check what clearance the highway or roads authority expects and whether it needs a licence.

What do we offer in Cheshire?

Traditional hanging signA painted timber or metal panel hangs from a wrought-iron style bracket.
Flat plate signA rigid aluminium composite panel is bolted to a slim wall bracket.
Swing or fixed fittingHanging signs can swing freely from the bracket or be held rigid, depending on exposure.

How much does it cost in Cheshire?

The guide price is £295 to £995 ex VAT per sign. Owners across the North West can add a projecting sign to a fascia order, so the Cheshire frontage can be measured and fitted together. Your written quote shows travel, access and any out-of-hours work.

Check the planning rules for Cheshire

Which towns do you cover?

Common questions

Do you cover all of Cheshire?

Yes. ShopFronts UK works across Cheshire, including Chester, Congleton, Crewe, Ellesmere Port.

Who is responsible if a sign falls?

Usually the person who owns or controls the sign, which makes regular checks worthwhile. Your public liability cover should include it, and your lease may say who maintains it. Look at the bracket and fixings every so often, particularly after high winds.

Do I need permission for a projecting sign?

Often, yes. In England, non-illuminated signs may have deemed consent, but lit ones lose that route in conservation areas and similar places. The highway authority may also license anything over the pavement. Scotland, Wales and Northern Ireland have their own rules, and we check these first.

How high does a projecting sign need to be?

Many authorities expect at least 2.5 m clear above the pavement, and some ask for more. In England, lit signs relying on Class 4B deemed consent must meet 2.5 m. The highway authority may set its own clearance, and rules differ in Scotland, Wales and Northern Ireland.

Get my free quote

Free survey and a written fixed quote.

Choose the closest match.
Enter a UK postcode.
Enter your name.
Enter a UK phone number.
Enter your email address.

Projecting signs in Cheshire

One contract, written quote and a 10-year workmanship guarantee.

Call nowGet a quote