March, Cambridgeshire
Illuminated signs in March
Deemed consent has tight limits, so we check whether your March sign needs an advertisement consent application before manufacture starts.

Businesses trading late across Cambridgeshire can use a photocell, so a March sign comes on at dusk without staff having to remember. Changing a sign later is simpler with a light box, so new businesses in Cambridgeshire may prefer that route on a March lease.
We are based in Great Barr, Birmingham, about 84 miles away, and send fitting teams across the East of England. Travel is included in your written quote, not added afterwards. We cover PE15 and the surrounding streets, along with Wisbech, Ely and Peterborough.
What are the options in March?
What does it cost in March?
Illuminated signs usually cost £795 to £3,495 ex VAT per sign, supplied and fitted. Letter count, size, lighting type and fixing height set the price, and built-up or halo-lit letters cost more than a printed light box. Power supply work, scaffold, removal of the old sign and any advertisement consent application can add to it. We confirm everything in a written quote.
Brand rollouts in Cambridgeshire work better with one sign pattern, and we can adapt it to the fascia size at your March branch. We protect the pavement and your stock, keep the opening secure at the end of every shift, and leave the March site clean.
Common questions
Can you come out to March for a survey?
Yes. New shopfronts and full refurbishments get a free survey in March. Repairs are a charged visit, and we tell you the cost of the visit before anyone comes out.
How long do LED shop signs last?
Usually many years, provided the driver and seals are good quality. The driver is often the first part to fail, not the LEDs. Manufacturers' warranties cover these components, and easy access to the driver makes a later replacement simpler.
Do I need consent for an illuminated shop sign?
Often yes in England, under the Town and Country Planning (Control of Advertisements) (England) Regulations 2007, especially in conservation areas. Some signs have deemed consent within strict limits. Scotland, Wales and Northern Ireland have their own rules. We can prepare drawings, and the council decides.
Do I need planning permission for a new shopfront in March?
Usually yes, if the new front changes how the building looks. Like-for-like repairs usually don't. Your local planning authority decides, and we can prepare the drawings. Signs and external shutters have their own rules.
Nearby
More in March
- Area
- Cambridgeshire
- Postcodes
- PE15
- Guide price
- from £795 ex VAT
- Guarantee
- 10-year workmanship