24/7 emergency line for break-ins and smashed glassCall 0800 088 6341

County Durham

Curtain walling in County Durham

Developers and landlords in the North East can get one priced package for a County Durham building, covering glazing, doors and spandrel panels together.

Curtain walling and cladding on a commercial building

South-facing glass can overheat a room, so we can price solar control glass for your County Durham premises if that is a concern. Taller glazing in the North East has to be designed for its wind exposure, so your County Durham site is assessed before the frame sizes are fixed.

What do we offer in County Durham?

Integrated doors and ventsEntrance doors, opening vents and louvres can be built into the grid.
Unitised systemFactory-assembled panels arrive ready to hang, which suits taller buildings and repeated layouts.
Stick systemMullions and transoms are fixed on site, then glazed. This is the usual route for low-rise retail and smaller frontages.

How much does it cost in County Durham?

The guide price is £550 to £950 ex VAT per m². Working at height needs planning, so access, scaffold and road space outside your County Durham building are covered in our quote for any job in the North East. Your written quote shows travel, access and any out-of-hours work.

Check the planning rules for County Durham

Which towns do you cover?

Common questions

Do you cover all of County Durham?

Yes. ShopFronts UK works across County Durham, including Bishop Auckland, Chester-le-Street, Consett, Darlington.

Do I need planning permission for curtain walling?

Usually yes in England, because it materially alters the external appearance of the building. Rules differ in Scotland, Wales and Northern Ireland, which run separate systems. We can prepare elevations and details to support an application, but the council makes the decision.

How is curtain walling kept watertight?

By drainage and pressure equalisation, not by sealant alone. Gaskets keep most water out, and any that gets past them drains through the frame and weeps back outside. Joints to the surrounding structure are sealed with membranes, and larger jobs are usually tested on site.

Does curtain walling need building regulations approval?

Yes in most cases, because it affects the external wall, energy and fire performance. In England, the relevant guidance includes Approved Documents L and B. Scotland uses building warrants and the Technical Handbooks, Northern Ireland uses Technical Booklets, and Wales has its own Approved Documents.

Get my free quote

Free survey and a written fixed quote.

Choose the closest match.
Enter a UK postcode.
Enter your name.
Enter a UK phone number.
Enter your email address.

Curtain walling in County Durham

One contract, written quote and a 10-year workmanship guarantee.

Call nowGet a quote