Wembley, Greater London
Aluminium shop fronts in Wembley
Fitting teams working across Greater London can work overnight or at weekends, so your Wembley shop can keep trading through the changeover.

If your Wembley unit has a damaged lintel or rotten subframe, we find it at survey and price it before any frame is ordered. Landlords with several units in Greater London can use one frame profile and RAL colour, so a Wembley frontage matches the rest of the estate.
We are based in Great Barr, Birmingham, about 97 miles away, and send fitting teams across London. Travel is included in your written quote, not added afterwards. Jobs in HA0, HA9, NW10 are planned alongside Harrow and Ealing.
What can we fit in Wembley?
What does it cost in Wembley?
As a guide, an aluminium shop front costs £2,495 to £7,995 ex VAT for a typical 3 to 5 m frontage, supplied and fitted. The final figure depends on width and height, glass type, the number of doors, any recessed entrance, thermally broken framing and how much of the old front needs stripping out. You get a free survey and a written fixed quote before anything is ordered.
A new aluminium shop front in Wembley starts with a free survey, so the written fixed quote reflects your actual opening and not a guess. Most fitting can be done early, late or at weekends, so a Wembley shop can keep trading through the work.
Common questions
Do you cover Wembley?
Yes. ShopFronts UK works in Wembley and across Greater London, including HA0, HA9, NW10. Call 0800 088 6341 or send the form with your postcode and we will confirm the details.
How long does an aluminium shop front take to fit?
A typical single frontage takes 2 to 4 days on site, after a typical lead time of 3 to 6 weeks from signed drawings. Wider frontages, recessed entrances and out-of-hours working stretch the programme, and we confirm your dates before the old front comes out.
Can I keep trading while the new front is fitted?
Yes, in most cases. Out-of-hours, overnight and weekend fitting can be arranged, and a secure temporary hoarding can close the opening between shifts. We agree the sequence at survey, so you know which parts of the shop stay open and when.
Do I need planning permission for a new shopfront in Wembley?
Usually yes, if the new front changes how the building looks. Like-for-like repairs usually don't. Your local planning authority decides, and we can prepare the drawings. Signs and external shutters have their own rules.
Nearby
More in Wembley
- Area
- Greater London
- Postcodes
- HA0, HA9, NW10, UB6
- Guide price
- from £2,495 ex VAT
- Guarantee
- 10-year workmanship