St Austell, Cornwall
Aluminium shop fronts in St Austell
Planning rules for shopfronts vary, so we check what the local planning authority covering St Austell expects before you commit to a design.

If your St Austell unit has a damaged lintel or rotten subframe, we find it at survey and price it before any frame is ordered. Landlords with several units in Cornwall can use one frame profile and RAL colour, so a St Austell frontage matches the rest of the estate.
We are based in Great Barr, Birmingham, about 196 miles away, and send fitting teams across the South West. Travel is included in your written quote, not added afterwards. Jobs in PL25 are planned alongside Bodmin and Truro.
What do most businesses choose in St Austell?
What does it cost in St Austell?
As a guide, an aluminium shop front costs £2,495 to £7,995 ex VAT for a typical 3 to 5 m frontage, supplied and fitted. The final figure depends on width and height, glass type, the number of doors, any recessed entrance, thermally broken framing and how much of the old front needs stripping out. You get a free survey and a written fixed quote before anything is ordered.
A new aluminium shop front in St Austell starts with a free survey, so the written fixed quote reflects your actual opening and not a guess. If you can't close, we phase the work: one bay at a time, with the unit left secure and weathertight every night.
Common questions
Can you come out to St Austell for a survey?
Yes. New shopfronts and full refurbishments get a free survey in St Austell. Repairs are a charged visit, and we tell you the cost of the visit before anyone comes out.
Do I need planning permission for a new aluminium shop front?
Usually yes in England, if the new front materially changes how the building looks. A like-for-like repair usually does not need it. Rules differ in Scotland, Wales and Northern Ireland, so we check first and can prepare drawings, though the council makes the decision.
How long does an aluminium shop front take to fit?
A typical single frontage takes 2 to 4 days on site, after a typical lead time of 3 to 6 weeks from signed drawings. Wider frontages, recessed entrances and out-of-hours working stretch the programme, and we confirm your dates before the old front comes out.
Do I need planning permission for a new shopfront in St Austell?
Usually yes, if the new front changes how the building looks. Like-for-like repairs usually don't. Your local planning authority decides, and we can prepare the drawings. Signs and external shutters have their own rules.
Nearby
More in St Austell
- Area
- Cornwall
- Postcodes
- PL25
- Guide price
- from £2,495 ex VAT
- Guarantee
- 10-year workmanship